Engineering and Environmental Geology

1. Sedimentology, Geochemistry And Provenance Of Late Proterozoic Salt Range Formation, Pakistan

  1. Sedimentology, Geochemistry and Provenance of late Proterozoic Salt Range Formation, Pakistan. Higher Education Commission funded project, No. 20-1555/R&D/10; dated: 19-07-2011.

Project Funding
 Funding Body Funds
1 Higher Education Commission no logo 2369595 Rs


Project Members
  • Dr. Muhammad Umar
  • 2. Pakistan Science Foundation Project

    Pakistan Science Foundation Project , Grant No./Project N.: B-BU/Earth (57),2001-2007 (including extension Period);


    Project Funding
     Funding Body Funds
    1 Pakistan Science Foundation no logo 500000 Rs


    Project Members
  • Dr. Muhammad Umar
  • 3. Investigation Of Main Active Faults And Major Engineering Geological Problems Along China-Pakistan Economic Corridor

    Description


    Project Funding
     Funding Body Funds
    1 Chinese Academy of Geological Sciences no logo 0 Rs


    Project Members
  • Dr. Javed  Iqbal
  • Dr. Ishtiaq A. K. Jadoon
  • 4. The Regional Crustal Stability Assessment Of Western Syntaxis

    Description

    Project Members
  • Dr. Javed  Iqbal
  • 5. Pollution Assessment Of Landfill Sites In The Hattar Industrial Estate (HIE) Using Integrated Geophysical Techniques, Budget 2.2 Million PKR

    Pollution Assessment of Landfill Sites in the Hattar Industrial Estate (HIE) using Integrated Geophysical Techniques, Budget 2.2 Million PKR

    Project Members
  • Dr. Said  Muhammad
  • 6. Debris Flows Assessment Under A Changing Climate: An Example From Indus River Basin, Northwest Himalayas

    Karakoram highway is diverse in geography, geology, and tectonics and the region is facing the world’s deadliest threat of this century known as “climate change”. The current project aimed at quantifying the debris flow hazard at the catchment to regional scale using field investigations combined with remote sensing, GIS, UAV-based RAMMS modeling, and Flow-R modeling. The current research considers not only the debris flow hazards along the KKH but also provides the climatic projections for precipitation and temperature and consequently debris flow hazard, risk, and vulnerability for early (2020-2040), mid (2040-2060) and end century (2060-2080) scenarios.

    The entire region is divided into two parts starting from Besham to Bunji section and Bunji to Khunjerab section with approximately 250km stretch lengths respectively. The first step was to create a database of debris flowing along the KKH. This task was achieved through extensive field surveys. Debris flows were identified based on their morphology, geology, and topographic characteristics. Local people were also involved to know the historical perspective of the gully. A total of 60 gullies are identified from Besham to Bunji and 71 gullies are identified from Bunji to Khunjerab section. Using the 12.5x12.5m DEM, catchments were delineated in the entire study area. Debris flow and non-debris flow catchments were differentiated and presented in diagrams. The next step was to categorize the catchments into debris flow, debris flood and flood catchments. This task was achieved through the morphometric assessment of the catchments by developing the relation between catchment length, width, slope, relief and relief ratio parameters. Out of 60 gullies, there were 31 & 49 debris flow, 36 & 17 debris flood and 4 & 5 were flood catchments respectively along two sections. Grain size distribution analysis of 29 massive debris flow gullies, the higher gravel and sand percentage is reported causing higher erosive power, mobility and impact force. Climatic projections show increasing spatiotemporal temperature and precipitation trends in the region. Hazard, Risk and vulnerability levels are high for early, mid and end century climatic scenarios. UAV based RAMMS modeling predicted the runout scenario perfectly for an active debris flow gully. Flow-R predicted enhanced debris flow susceptibility at the regional scale.


    Project Funding
     Funding Body Funds
    1 National Natural Science Foundation of China (NSFC) no logo 8000000 Rs


    Project Members
  • Dr. Javed Tanoli